How to setup outside processing –Procure to use in WIP for standard costing
1.Create items:
à Finished Item
(N): InventoryàItemsàMaster Item
Item Name: OSP_FIN_ITEM
(M) ToolsàCopy from
Select template as ‘Finished Good’ Click Done
Save
Select template as ‘Finished Good’ Click Done
Save
Assign this item to M1 organization
Create one OSP item
Item name: OSP_ITEM
(N): InventoryàItemsàMaster Item
(M) ToolsàCopy from
Select template as ‘Outside Processing Item’ click done
Select template as ‘Outside Processing Item’ click done
Save
OSP Item setting:
(T)-Main: Primary Unit of Measure =‘HRS’
(T) Purchasing:
Check Purchasable: Set this attribute to Yes to include an item on a purchase order line.
Check Outside Processing Item: Set this attribute to Yes to link an outside processing item with an outside resource and to include an item on an outside processing purchase order line.
Outside Processing Unit Type – Select Resource (If you want to requisition the usage rate or amount of the outside resource for each assembly you move to an outside operation, you should set the Outside Processing Unit Type to Resource).
If you want to requisition one outside processing item for each assembly you ship to a supplier, then you should set the Outside Processing Unit Type to Assembly.
Check Purchasable: Set this attribute to Yes to include an item on a purchase order line.
Check Outside Processing Item: Set this attribute to Yes to link an outside processing item with an outside resource and to include an item on an outside processing purchase order line.
Outside Processing Unit Type – Select Resource (If you want to requisition the usage rate or amount of the outside resource for each assembly you move to an outside operation, you should set the Outside Processing Unit Type to Resource).
If you want to requisition one outside processing item for each assembly you ship to a supplier, then you should set the Outside Processing Unit Type to Assembly.
Assign to M1 organization.
Create subassembly item:
(N): InventoryàItemsàMaster Item
(M) ToolsàCopy from
Select template as ‘subassembly’
Select template as ‘subassembly’
Item name: OSP_SUB_ITEM click done
Save.
Create 3 purchased items
Purchased item 1:
Name: OSP_PUR1
(N): InventoryàItemsàMaster Item
(M) ToolsàCopy from
Select template as ‘Purchased Item’
Select template as ‘Purchased Item’
Save the item and assign the M1 organization
Assign the cost for this item in M1 organization
(N): Inventoryàcostàitem cost
Enter item and click find
After opened Item costs Summary (M1) form
Enter Item OSP_PUR1 (PURCHASED ITEM1)
Cost Type -- Pending
Click Open, then click Costs
Cost Type -- Pending
Click Open, then click Costs
Click Costs button
Enter Cost Element -- Material
Subelement -- Material
Activity -- Move
Basis -- Item
Rate or Amount -- 100
Go to next line enter Cost Element -- Material Overhead
Enter subelement -- Mat’l Hndlg
Activity -- Move
Basis -- Total Value
Subelement -- Material
Activity -- Move
Basis -- Item
Rate or Amount -- 100
Go to next line enter Cost Element -- Material Overhead
Enter subelement -- Mat’l Hndlg
Activity -- Move
Basis -- Total Value
Rate or Amount -- 10
Save.
Purchased item 2:
Name: OSP_PUR2 (purchased item2)
(N): InventoryàItemsàMaster Item
(M) ToolsàCopy from
Select template as ‘Purchased Item’
Select template as ‘Purchased Item’
Assign to M1 organization
(N): Inventoryàcostàitem cost
Enter item and click find
Click on cost button.
Enter Cost Element -- Material
Subelement -- Material
Basis -- Item
Rate or Amount -- 100
Subelement -- Material
Basis -- Item
Rate or Amount -- 100
Save.
Purchased item 3:
Name: OSP_PUR3 (purchased item3)
(N): InventoryàItemsàMaster Item
(M) ToolsàCopy from
Select template as ‘Purchased Item’
Select template as ‘Purchased Item’
Assign to M1 organization
(N): Inventoryàcostàitem cost
Enter item and click find
Click on cost button.
Enter Cost Element -- Material
Subelement -- Material
Basis -- Item
Rate or Amount -- 100
Subelement -- Material
Basis -- Item
Rate or Amount -- 100
Save.
2: Define outside Resources:
You must define outside resources and link them to outside processing items in order to automatically generate purchase requisitions for outside processing. When assigning outside resources to a routing you also specify a usage rate or amount that determines the quantity you are requisitioning and/or charging to work in process jobs or repetitive schedules.
(N) Order ManagementàBills of materialsàRoutingsàResources
Create resource named OSP-RES (new)
Select Type -- Person
Select UOM -- HR
Select Charge Type -- PO Move (type PO Move or PO Receipt will perform automatically requisition. Purchasing charges these resource to jobs and repetitive schedules when you receive against purchase order lines linked to the resources.
Click Enabled for the outside processing item - and enter OSP_ITEM (OSP Item name)
Select Type -- Person
Select UOM -- HR
Select Charge Type -- PO Move (type PO Move or PO Receipt will perform automatically requisition. Purchasing charges these resource to jobs and repetitive schedules when you receive against purchase order lines linked to the resources.
Click Enabled for the outside processing item - and enter OSP_ITEM (OSP Item name)
Select Basis -- Item.
Select Activity -- Move
Click Standard Rate (If you charge at standard, then Purchasing writes any variance between the purchase order actual and the source standard cost to the purchase price variance account of the resource at purchase order receipt) You can also charge at actual PO line price.
Click on rates button
Enter Frozen Cost type and Resource Unit Cost of 20.00.
Pending Cost type and Resource Unit Cost of 20.00.
Pending Cost type and Resource Unit Cost of 20.00.
Save.
3: Set the department and link to resources
(N) Order ManagementàBills of materialsàRoutingsà
Enter Department -- OSP-DEP (Department name)
Enter Description
Class -- Vendor
Location -- Select WILLINGTON.
Enter Description
Class -- Vendor
Location -- Select WILLINGTON.
Click Resource button in Departments form
Click in Resource field under Owned section
Select OSP-RES
Check Available 24 Hours
UOM -- HR
Units -- Enter 10
Group -- Select Vendor
Save
Check Available 24 Hours
UOM -- HR
Units -- Enter 10
Group -- Select Vendor
Save
Close the form
Click Rates button in the Departments form
Cost Type -- Select Pending
Go to Overhead Rates Section, Overhead -- Select Indirect
Activity -- Move
Basis -- Resource Value
Rate or Amount -- .05
Save
Go to Overhead Rates Section, Overhead -- Select Indirect
Activity -- Move
Basis -- Resource Value
Rate or Amount -- .05
Save
4: setup the Routing
(N) Order ManagementàBills of materialàRoutingsàRoutings
In item field enter OSP_FIN_ITEM (Finished Good)
Go to the Operations section and enter the following:
In item field enter OSP_FIN_ITEM (Finished Good)
Go to the Operations section and enter the following:
Operation.1
Seq - 10
Department - Assembly
Click on Operation Resources.
Seq - 10
Department - Assembly
Click on Operation Resources.
Go to the Resources section and enter the following:
Seq -- 10
Resource -- LBR-ASSY
UOM should default in with HR
Basis -- Item
Usage -- 1, Close Operation Resources form and go back to main Routing form.
Seq -- 10
Resource -- LBR-ASSY
UOM should default in with HR
Basis -- Item
Usage -- 1, Close Operation Resources form and go back to main Routing form.
Save.
2nd Operation
Seq - 20
Department -- OSP-DEP (Department name)
Click on Operation Resources.
Seq - 20
Department -- OSP-DEP (Department name)
Click on Operation Resources.
Go to the Resources section and enter the following:
Seq -- 10
Resource -- OSP-RES (Resources name)
Seq -- 10
Resource -- OSP-RES (Resources name)
UOM should default in with HR
Basis -- Item
Usage -- 2, Close Operation Resources form and go back to main Routing form.
Save the Routing.
Basis -- Item
Usage -- 2, Close Operation Resources form and go back to main Routing form.
Save the Routing.
Do the same routing process for subassembly item with routing name= ‘OSP-SUB-ITEM’ (Subassembly Item)
5: Defining Bill Of material
(N) Order ManagementàBills of materialàBillsàBills
Item -- Enter OSP_SUB_ITEM (Subassembly Item)
Components Region:
First Line
Item Seq -- 10
Operation Seq -- select 1
Component – OSP_PUR2 (Purchase Item2)
Components Region:
First Line
Item Seq -- 10
Operation Seq -- select 1
Component – OSP_PUR2 (Purchase Item2)
Quantity – 1
Second Line
Item Seq -- 20
Operation Seq -- 1
Component – OSP_PUR3 (Purchased Item3)
Item Seq -- 20
Operation Seq -- 1
Component – OSP_PUR3 (Purchased Item3)
Quantity -- 1
Save
Select the Material Control
Select the Material Control Tab
Supply Type -- Assembly Pull (operation pull not available because we have no routing)
Subinventory -- Floorstock
Save your work.
Subinventory -- Floorstock
Save your work.
Go to toolsàclick on Rollup costs
Enter cost type= Pending
Click ok
Go to viewàRequest àfind
Click on view output button
Do the same process for finished good
Item -- Enter OSP_FIN_ITEM (Finished Item)
Components Region:
First Line
Item Seq -- 10
Operation Seq -- select 10
Component – OSP_PUR1 (Purchase item1)
Quantity – 1
First Line
Item Seq -- 10
Operation Seq -- select 10
Component – OSP_PUR1 (Purchase item1)
Quantity – 1
Second Line
Item Seq -- 20
Operation Seq -- 10
Component – OSP_SUB_ITEM (Subassembly item)
Item Seq -- 20
Operation Seq -- 10
Component – OSP_SUB_ITEM (Subassembly item)
Quantity -- 1
Save
Select the Material Control Tab
For each component select the following:
Supply Type -- Operation Pull
Subinventory -- Floorstock
For each component select the following:
Supply Type -- Operation Pull
Subinventory -- Floorstock
Save your work.
After successfully completed check the output for finished good
6: Create miscellaneous receipt for purchased items
(N) InventoryàTransactionsàMiscellaneous Transaction
In Type field and Miscellaneous Receipt,
click Transaction Lines
In Type field and Miscellaneous Receipt,
click Transaction Lines
Enter quantity for 3 purchased items
OSP_PUR1
OSP_PUR2
OSP_PUR3
Save the work.
Verify that Items exists in Inventory: (N) InventoryàOn-Hand AvailabilityàOn-Hand Quantitiesà query for Subinventory = Floorstock
7: create the jobs for subassembly Item
N) WIPàDiscreteàDiscrete Jobs
Click on new button
Enter Job number -- OSP_SUB_JOB (New)
Enter Assembly -- OSP_SUB_ITEM (Subassembly Item)
Class - Discrete
Status - Released
Type - Standard
Start Quantity - 50
Start Date - Enter today’s date.
In TAB Routing enter the Completion Subinventory -- Floorstock
Save
Status - Released
Type - Standard
Start Quantity - 50
Start Date - Enter today’s date.
In TAB Routing enter the Completion Subinventory -- Floorstock
Save
Order ManagementàWIPàMove TransactionsàMove Transaction
Enter the Job = ‘OSP_SUB_JOB’
Enter Qty = 100
Save.
Check that in Subinventory Floorstock we have the on hand of 100
8: setup Employee
Purchasing requires an employee for all requisitions/purchase orders to be created and approved.
ResponsibilityàUS HRMS Manager.
(N) PeopleàEnter and Maintain
ResponsibilityàUS HRMS Manager.
(N) PeopleàEnter and Maintain
Click on new button
Enter Last Name, Gender
Action -- Create Employment
Person Type -- Employee
Social Security Number -- number with format: xxx-xx-xxxx
Enter Birthdate
Save
Click on Assignment Button
Organization -- Vision Operations
(B) Correction
Job-- MGR.500.Manager
Group-- Financial
Position-- MM400.Material manager (this is a position that will have the approval authority for your purchase order)
(B) Yes – to accept the default values
(B) Correction
Job-- MGR.500.Manager
Group-- Financial
Position-- MM400.Material manager (this is a position that will have the approval authority for your purchase order)
(B) Yes – to accept the default values
Assign a Supervisor:
(T) Supervisor
Name-- Brown, Ms. Casey
(T) Supervisor
Name-- Brown, Ms. Casey
Assign a Default Expense Account:
(T) Purchase Order Information
Set of Books-- Vision Operations
Default Expense Account-- 01-110-7740-0000-000
(T) Purchase Order Information
Set of Books-- Vision Operations
Default Expense Account-- 01-110-7740-0000-000
Save the work.
Link the Employee to the user:
Responsibility System Administrator
(N) SecurityàUseràDefine.
Query up Username
Add Employee to Person field.
Responsibility System Administrator
(N) SecurityàUseràDefine.
Query up Username
Add Employee to Person field.
Responsibility Manufacturing and Distribution Manager
(N) PurchasingàSetupàPersonnelàBuyers.
(N) PurchasingàSetupàPersonnelàBuy
Add Employee to Buyer field
Enter Ship-to org of ‘M1 –Seattle’
Enter Ship-to org of ‘M1 –Seattle’
Click on go and click on Add Buyer
Save.
9: Sourcing Rules
You can define rules for each outside processing item to help you determine from which supplier to source the item.
Creation of the Standard Quotation:
(N) PurchasingàRFQ’s and QuotationsàQuotations
Choose Quotation Type -- Standard Quotation Type
Enter Supplier -- Advanced Networking Devices
Enter Supplier Site -- Santa Clara
Enter Ship-To as M1 – Seattle
Creation of the Standard Quotation:
(N) PurchasingàRFQ’s and QuotationsàQuotations
Choose Quotation Type -- Standard Quotation Type
Enter Supplier -- Advanced Networking Devices
Enter Supplier Site -- Santa Clara
Enter Ship-To as M1 – Seattle
Enter Effective Date - Today’s Date
Enter Effective through Date - One Year from now
Change Status from In-Process to Active
Choose Item - ‘OSP_ITEM’ (OSP Item)
enter a price of 20.00
Save - Take note of the Quotation Number
Creation of the Approved Supplier List Entry
(N) PurchasingàSupply BaseàApproved Supplier List
Select M1 organization.
Click in the Item Field and choose the Item created from Step 1 -- ‘OSP-ITEM’
Move to the bottom section of the form -- Choose Direct for the ‘Business’ field.
Enter ‘Advanced Networking Devices’ in the Supplier field since it was used on the quotation.
Enter the Supplier Site ‘SANTA CLARA’ that was used in this test.
Change the status field from NEW to APPROVED.
Switch the tab from ‘KEY ATTRIBUTES’ to ‘RECORD DETAILS’
Update Global Field selection from No to Yes - we are making this entry Global for all Organizations.
Update Global Field selection from No to Yes - we are making this entry Global for all Organizations.
Save
Select the attributes button.
Choose Release Method Field and enter ‘Release Using Autocreate’
Do not enter any values for the Price Update Tolerance
Do not enter any values for the Purchasing UOM
Choose the bottom portion of the form - in the field TYPE - Enter ‘Quotation’
Choose Release Method Field and enter ‘Release Using Autocreate’
Do not enter any values for the Price Update Tolerance
Do not enter any values for the Purchasing UOM
Choose the bottom portion of the form - in the field TYPE - Enter ‘Quotation’
Choose the Number field - Hit the List of Values.
Quotation document displaying above you created
choose the Line field and select the number 1 for the line.
choose the Line field and select the number 1 for the line.
Save.
Creation of Sourcing Rule:
(N) PurchasingàSupply BaseàSourcing Rules
Choose Sourcing Rule Name field -- ‘OSP-Advanced Networking Source’
Choose Description field and enter -- ‘Sourcing Rule for Quotation to Req to PO’
Select the ‘ALL ORGS’ radio button to the right of the above two fields
Select Effect Date field - enter first portion of the effective date -- todays date drops
Choose Description field and enter -- ‘Sourcing Rule for Quotation to Req to PO’
Select the ‘ALL ORGS’ radio button to the right of the above two fields
Select Effect Date field - enter first portion of the effective date -- todays date drops
Select lower section of screen - Type field -- Choose ‘BUY FROM’
Skip the Org Field
Move to the Supplier Field -- select ‘Advanced Networking Devices’
Move to the Supplier Site field -- select ‘SANTA CLARA - Vision operations’
Enter Allocation field -- set this to 100%
Select the Rank field -- insert a value of 1
Skip the Org Field
Move to the Supplier Field -- select ‘Advanced Networking Devices’
Move to the Supplier Site field -- select ‘SANTA CLARA - Vision operations’
Enter Allocation field -- set this to 100%
Select the Rank field -- insert a value of 1
Save.
Creation and Explanation of a Sourcing Rule Assignment Set
(N) PurchasingàSupply BaseàAssign Sourcing Rules
(N) PurchasingàSupply BaseàAssign Sourcing Rules
Enter the field Assignment Set -- enter value ‘OSP_TEST’
Description -- ‘Creating Assignment Set to test funct for OSP’
Click underneath the ‘Assigned To’ box -- Choose Item
Select field ‘Item/Category’ select the Item ‘OSP_ITEM’ (OSP ITEM)
Choose field TYPE -- select ‘Sourcing Rule’
Choose field SOURCING RULE/BoD -- Hit the List of Values and select the sourcing rule which was created above -- ‘OSP-Advanced Networking Source’
Description -- ‘Creating Assignment Set to test funct for OSP’
Click underneath the ‘Assigned To’ box -- Choose Item
Select field ‘Item/Category’ select the Item ‘OSP_ITEM’ (OSP ITEM)
Choose field TYPE -- select ‘Sourcing Rule’
Choose field SOURCING RULE/BoD -- Hit the List of Values and select the sourcing rule which was created above -- ‘OSP-Advanced Networking Source’
Save.
Sourcing Rule Assignment Profile Setup and Logic:
(N) Purchasingà Personal Profiles
Query on the profile name with:à MRP:Default Sourcing Assignment Set
Click in the ‘User Value’ section
Select the newly created assignment Set -- PR_OSP_TEST
(N) Purchasingà Personal Profiles
Query on the profile name with:à MRP:Default Sourcing Assignment Set
Click in the ‘User Value’ section
Select the newly created assignment Set -- PR_OSP_TEST
Save
WIPàSetupàParameters
Select the Outside Processing tab
select ‘At operation’ for Requisition Creation Time
this way, requisitions will be automatically imported into Purchasing immediately upon performing a WIP Move transaction
Select the Outside Processing tab
select ‘At operation’ for Requisition Creation Time
this way, requisitions will be automatically imported into Purchasing immediately upon performing a WIP Move transaction
Save.
10: Create job for Finished Good:
(N) WIPàDiscreteàDiscrete Jobs
Click on new button
Enter Job number -- OSP_-FIN_JOB (new)
Enter Assembly -- OSP_FIN_ITEM (Finished Good)
Class -- Discrete
Status -- Released
Type -- Standard
Start Quantity -- 10
Start Date -- Enter today’s date.
In TAB Routing enter the Completion Subinventory – Stores
Class -- Discrete
Status -- Released
Type -- Standard
Start Quantity -- 10
Start Date -- Enter today’s date.
In TAB Routing enter the Completion Subinventory – Stores
Save
11: Perform a WIP move transaction to the Osp Item
(N) WIPàMoveTransactionsàMove Transactions
Select Job – OSP_FIN_JOB (Finished good job)
select the first operation 10 from the list of values for “From” filed and select Queue for “Step” field.
Go to the next row labeled “To” select OSP operation 20
Go to the Step field and select Queue
Go to the Quantity field in the Transaction section.
Enter quantity -- 10.
select the first operation 10 from the list of values for “From” filed and select Queue for “Step” field.
Go to the next row labeled “To” select OSP operation 20
Go to the Step field and select Queue
Go to the Quantity field in the Transaction section.
Enter quantity -- 10.
Save.
Check with requisition
Note the requisition_header_id
For check the item we can query with requisition_header_id in PO_REQUISITION_LINES_ALL
Here we can see our OSP item details.
Go to purchasingàrequisitionsàrequisition summary
Click on find button.
Copy the purchased order number. Check whether purchase order is approved or not.
After approve Create a receipt based on the purchased order number.
Now complete the job for finished item (OSP_FIN_JOB) from ‘Queue’ to ‘To move’ as specified in subassembly job.
Check finished item in on hand quantity.